| Boiler — bottom blow-down: blow mud until clear water |
1 days |
clean |
Maker |
| Boiler — second boiling-out after first 2-3 months of operation, with inside cleaning and inspection |
2 months |
initial |
Maker |
| Boiler — sweep boiler and chimney |
1 years |
clean |
Maker |
| Burner — adjustment rod joints: check and lubricate |
1 years |
lubricate |
Maker |
| Burner — air damper lock screws and servomotor axle lock: check, retighten |
1 years |
check |
Maker |
| Burner — burner head extension: check, change if necessary |
1 years |
inspect |
Maker |
| Burner — clean burner from dust and moisture |
1 years |
clean |
Maker |
| Burner — combustion check by flue gas measurement |
1 years |
test |
Maker |
| Burner — diffuser disc: check, change if necessary |
1 years |
inspect |
Maker |
| Burner — filters: clean |
1 years |
clean |
Maker |
| Burner — flame detector: check position, condition and cleanness |
1 years |
inspect |
Maker |
| Burner — ignition electrodes: clean and check setting |
1 years |
clean |
Maker |
| Burner — oil nozzle: change if worn or damaged |
1 years |
inspect |
Maker |
| Burner — oil pump capacity: check |
1 years |
check |
Maker |
| Dosing pump — liquid end screws: check tightening torque (PP pumps) |
3 months |
check |
Maker |
| Dosing pump — liquid end screws: check tightening torque 24 h after start / diaphragm change |
24 h |
initial |
Maker |
| F.O. pump — check function of spare pump and operate change-over lever |
1 weeks |
test |
Maker |
| F.O. pump — station visual, noise and gasket check |
1 days |
inspect |
Maker |
| Feed water control valve — overhaul diaphragm, sliding parts and O-rings |
1 years |
overhaul |
Maker |
| Feed water control valve — static test, inspect valve disc and seat |
6 months |
inspect |
Maker |