| Air filter and air vessel - pressure check |
1 days |
check |
Maker |
| Bolt for base frame and resilient mount - retighten |
8,000 h |
overhaul |
Maker |
| Bolt for base frame and resilient mount - retighten (confirm after overhaul / refitting / new) |
200 h |
initial |
Maker |
| Bolts for engine block and base frame - retighten |
8,000 h |
overhaul |
Maker |
| Bolts for engine block and base frame - retighten (confirm after overhaul / refitting / new) |
200 h |
initial |
Maker |
| Bolts for exhaust pipe axial compensator - retighten |
4,000 h |
check |
Maker |
| Bolts for turbocharger - retighten |
8,000 h |
overhaul |
Maker |
| Bolts for turbocharger - retighten (confirm after overhaul / refitting / new) |
200 h |
initial |
Maker |
| Camshaft bearings - clearance check (check 1 set) |
16,000 h |
check |
Maker |
| Camshaft bearings - planned overhaul |
32,000 h |
overhaul |
Maker |
| Centrifugal filter - clean and replace |
1 months |
clean |
Maker |
| Charge air cooler - clean (planned) |
4,000 h |
clean |
Maker |
| Check alignment of expansion joint (confirm after overhaul / refitting / new) |
200 h |
initial |
Maker |
| Check compressed air system |
1 weeks |
check |
Maker |
| Check governor oil level |
1 days |
check |
Maker |
| Check rotation of rotocap during operation |
1 weeks |
check |
Maker |
| Checking and adjustment of valve clearance |
2,000 h |
check |
Maker |
| Checking and adjustment of valve clearance (confirm after overhaul / refitting / new) |
200 h |
initial |
Maker |
| Connecting rod bearings (big ends) - inspect (check 1 set) |
8,000 h |
inspect |
Maker |
| Connecting rod bearings (big ends) - planned overhaul |
24,000 h |
overhaul |
Maker |
| Connecting rod bearings (small ends) - inspect (check 1 set) |
8,000 h |
inspect |
Maker |
| Connecting rod bearings (small ends) - planned overhaul |
32,000 h |
overhaul |
Maker |
| Cooling water - analyse properties (sample) |
1 months |
analyse |
Maker |
| Cooling water - complete renewal |
2 years |
replace |
Maker |
| Cooling water pump - overhaul |
16,000 h |
overhaul |
Maker |
| Cooling water thermostatic valve - inspect |
12,000 h |
inspect |
Maker |
| Crankshaft - deflection check |
8,000 h |
inspect |
Maker |
| Cylinder head cooling water space - inspect and clean |
16,000 h |
clean |
Maker |
| Cylinder liner - reconditioning (honing) |
16,000 h |
overhaul |
Maker |
| Flywheel gear rim teeth - inspect |
4,000 h |
inspect |
Maker |
| Fuel injection pump - check plunger assembly |
8,000 h |
check |
Maker |
| Fuel injection pump - replace deflector |
4,000 h |
replace |
Maker |
| Fuel injection valve - check and adjust the opening pressure |
2,000 h |
test |
Maker |
| Fuel injection valve - check and adjust the opening pressure (confirm after overhaul / refitting / new) |
200 h |
initial |
Maker |
| Governor linkage - function check |
1 weeks |
test |
Maker |
| Indicator valve - overhaul |
16,000 h |
overhaul |
Maker |
| Intake/exhaust valve, seats and guide - overhaul and regrind valve and seat |
16,000 h |
overhaul |
Maker |
| L.O. thermostatic valve - inspect, clean and check the elements |
12,000 h |
inspect |
Maker |
| Lubricating oil - analyse oil properties (sample) |
1 months |
analyse |
Maker |
| Lubricating oil pump - overhaul |
16,000 h |
overhaul |
Maker |
| Main bearings - inspect (check 1 set) |
8,000 h |
inspect |
Maker |
| Main bearings - planned overhaul |
24,000 h |
overhaul |
Maker |
| Measure big-end bore, check clearance between piston pin and small end |
16,000 h |
inspect |
Maker |
| Nut for resilient mount and foundation - retighten |
8,000 h |
overhaul |
Maker |
| Nut for resilient mount and foundation - retighten (confirm after overhaul / refitting / new) |
200 h |
initial |
Maker |
| Nuts for camshaft - retighten |
8,000 h |
overhaul |
Maker |
| Nuts for camshaft - retighten (confirm after overhaul / refitting / new) |
200 h |
initial |
Maker |
| Nuts for connecting rod - retighten |
8,000 h |
overhaul |
Maker |
| Nuts for connecting rod - retighten (confirm after overhaul / refitting / new) |
200 h |
initial |
Maker |
| Nuts for counter weight - retighten |
8,000 h |
overhaul |
Maker |
| Nuts for counter weight - retighten (confirm after overhaul / refitting / new) |
200 h |
initial |
Maker |
| Nuts for cylinder head - retighten |
8,000 h |
overhaul |
Maker |
| Nuts for cylinder head - retighten (confirm after overhaul / refitting / new) |
200 h |
initial |
Maker |
| Nuts for main bearing cap - retighten |
8,000 h |
overhaul |
Maker |
| Nuts for main bearing cap - retighten (confirm after overhaul / refitting / new) |
200 h |
initial |
Maker |
| Nuts for timing gears - retighten |
8,000 h |
overhaul |
Maker |
| Nuts for timing gears - retighten (confirm after overhaul / refitting / new) |
200 h |
initial |
Maker |
| Piston, piston pin and piston rings - inspect (check 1 set) |
8,000 h |
inspect |
Maker |
| Piston, piston pin and piston rings - planned overhaul |
16,000 h |
overhaul |
Maker |
| RPM pick-up - clearance check |
8,000 h |
check |
Maker |
| Resilient mounts - inspect |
8,000 h |
inspect |
Maker |
| Resilient mounts - inspect (confirm after overhaul / refitting / new) |
200 h |
initial |
Maker |
| Rocker arms shaft and bearing - check clearance |
16,000 h |
check |
Maker |
| Safety device check |
200 h |
test |
Maker |
| Starting valve for main and emergency - function check |
1 months |
test |
Maker |
| Tappet roller shaft and bearing - check clearance |
16,000 h |
check |
Maker |
| Thrust washer - axial clearance check |
8,000 h |
check |
Maker |
| Timing gears and pump driving gears - clearance and backlash check |
16,000 h |
check |
Maker |
| Torsional vibration damper - take fluid sample |
24,000 h |
analyse |
Maker |
| Turbocharger air filter - clean |
500 h |
clean |
Maker |
| Turbocharger compressor - clean (water-washing) |
24 h |
clean |
Maker |
| Turbocharger turbine - clean (water-washing) |
200 h |
clean |
Maker |